Ashegoda Wind Farm Project site located approximately 775 km from Addis Ababa and less than 20 km from Mekele , the area mainly used for farming and agriculture purpose.
The Grand Ethiopian Renaissance Dam (Amharic: ህዳሴ ግድብ? Hidāse Gēdīb ), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is an under-construction gravity dam on the Blue Nile River in Ethiopia.
The Ethiopian Electric Power Corporation (EEPCo), which is totally government owned autonomous agency and administered by a Management Board, is the project executing institution for Gibe III Hydroelectric Project.
The Ethiopian Railways Corporation has identified eight railway corridors for study, design and subsequent implementation, the total estimated length with buffer of which is some 5060km.