Ashegoda Wind Farm Project site located approximately 775 km from Addis Ababa and less than 20 km from Mekele , the area mainly used for farming and agriculture purpose.
The Grand Ethiopian Renaissance Dam (Amharic: ህዳሴ ግድብ? Hidāse Gēdīb ), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is an under-construction gravity dam on the Blue Nile River in Ethiopia.
The Ethiopian Electric Power Corporation (EEPCo), which is totally government owned autonomous agency and administered by a Management Board, is the project executing institution for Gibe III Hydroelectric Project.
Engineering consultants usually work as part of a consulting company, and come into the field after receiving an engineering degree and obtaining several years of experience in the field.
Pulleys and cables are the material that is main material which is used to design cranes. The main purpose of crane is to lift the material and to lower the material.
Structural engineers analyze, design, plan, and research structural components and structural systems to achieve design goals and ensure the safety and comfort of users or occupants.
Sometimes all the planning of a company for building or excavating an area go waste if there is no proper equipment that can fulfill the requirements of the construction projects.
More projects fail than succeed. 44% of all projects were late, over budget, and/or with less than the required features and functions, 24% of all projects were cancelled prior to completion or delivered and never used.